Ágoston, Kolos Csaba (2019) The Effect of Welding on the One-Dimensional Cutting-Stock Problem : The Case of Fixed Firefighting Systems in the Construction Industry. Advances in Operations Research, 2019 . DOI https://doi.org/10.1155/2019/6507054
PDF
- Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
538kB |
Official URL: https://doi.org/10.1155/2019/6507054
Abstract
Safety is paramount in the construction industry and the fixed sprinkler and water spray systems used in firefighting involve networks of pipes of various lengths. Manufacturers of such fixed firefighting systems need to either cut the existing stocks to length—a (one-dimensional) cutting-stock problem—or lengthen the existing stocks or leftover segments through welding, a (one-dimensional) cutting-stock problem with welding. Best industry practice safety requirements allow only one weld per length of pipe. The case of a Hungarian manufacturer of fixed firefighting systems motivates this article, which argues that the cutting-stock problem with welding (with single- or multiple-size stocks) may be converted to an equivalent cutting-stock problem (with multiple-size stocks). Readily available algorithms and software may then be used to generate an optimal cutting plan for the equivalent cutting-stock problem. Subject to certain restrictions, the optimal cutting plan for the equivalent cutting-stock problem may then be converted to cutting patterns for the original cutting-stock problem with welding.
Item Type: | Article |
---|---|
Divisions: | Faculty of Economics > Department of Operations Research and Actuarial Sciences |
Subjects: | Mathematics, Econometrics |
Funders: | Magyar Tudományos Akadémia |
Projects: | KEP 6/2017 |
DOI: | https://doi.org/10.1155/2019/6507054 |
ID Code: | 10009 |
Deposited By: | MTMT SWORD |
Deposited On: | 10 Jun 2024 08:29 |
Last Modified: | 10 Jun 2024 08:29 |
Repository Staff Only: item control page